Plant and Equipment

Naric owns and operates several pieces of heavy earthmoving plant including the following:

 

          • 12G Grader
          • 24t Hitachi Excavator
          • 5t Clarke excavator
          • 4 series Huski bobcat
          • JCB and Cat Backhoes
          • Flat bed transports
          • 7000 litre water carts
          • 3point and double drum rollers
          • 2 x single axle tippers
          • Attachments for excavators, bobcats and backhoes
          • GPS equipment for detailed survey and setout requirements                               on complicated and large projects
          • Utilities and trades trucks and site storage facilities

 

          The machinery is either new or near new and regularly serviced and maintained with skilled operators and fully compliant with current workplace safety requirements.

 

          The range of machinery owned allows this equipment to be utilised on several projects 100% of the time with additional machinery being hired in on an as required basis. We have access to machinery as large or as small as necessary and have completed earthworks projects over 100,000m3 in volume down to as little as 50m3.

NEWS
  •  

    Amberley stage 3 Fitness centre
    Contract value              - $2.7M
    Client                              - Department of Defence
    Engineer                        - Thomas & Coffey for Thinc Projects
    Time To Complete      - 46 Weeks
    Project Manager         - Richard Probert
    Description of works- The works include bulk earthworks 25000m3, the construction of internal roadworks and carparks, internal stormwater drainage and construction of two sporting fields.

     
    Subdivision at Thornlands Rd, Thornlands
    Contract value                          - $1.9M
    Client                                          - Oxmar Properties
    Engineer                                    - Brown Consulting
    Time To Complete                   - 22 weeks
    Project Manager                      - Richard Probert
    Description of works              - The works include bulk earthworks 23000m3, the construction of internal roads, an external widening stormwater drainage, sewer and water reticulation.
     
    Subdivision at School Rd, Redbank Plains
    Contract value                          - $0.8M
    Client                                          - MarxProperty Group
    Engineer                                    - Baker Rossow
    Time To Complete                   - 20 weeks
    Project Manager                     - Richard Probert
    Description of works             - The works include dam filling, bulk earthworks, the construction of internal roads, construction of a large open channel stormwater drain, stormwater drainage, sewer and water reticulation.
     
    Bradman St, Acacia Ridge
    Contract value                          - $2M
    Client                                           - Thomas & Coffey
    Engineer                                     - ADG
    Time To Complete                    - 28 weeks
    Project Manager                      - Richard Probert
    Description of works              - Bulk earthworks, carpark and road construction and stormwater drainage.
     
    Subdivision at Baxter Rd, Gowrie Junction
    Contract value                         - $1.8M
    Client                                          - QH Projects
    Engineer                                    - Wood & Grieve
    Time To Complete                  - 26 weeks
    Project Manager                     - Ian Hargreaves
    Description of works             - Bulk earthworks, road construction, stormwater drainage and sewer and water reticulation.
     
    Subdivision at CSIRO, Samford
    Contract value                         - $2.3M
    Client                                          - Oxmar
    Engineer                                    - Cardno
    Time To Complete                   - 24 weeks
    Project Manager                     - Ian Hargreaves
    Description of works             - Bulk earthworks, road construction, stormwater drainage and sewer and water reticulation.
     
    Subdivision at Cowie Rd, Carseldine
    Contract value                          - $0.7M
    Client                                          - Oxmar
    Engineer                                    - Wood & Grieve
    Time To Complete                   - 16 weeks
    Project Manager                     - Ian Hargreaves
    Description of works             - Bulk earthworks, road construction, stormwater drainage and sewer and water reticulation.
     
    Lot 5 Westwood Drive Samford
    Contract value                        - $2M
    Client                                        - Haig Developments
    Engineer                                  - Brown Consulting
    Time To Complete                 - 16 Weeks
    Council                                     - Pine Rivers Shire
    Project Manager                    - Ian Hargreaves
    Description of works                                                         - The works include bulk earthworks the construction of internal roadworks (2km), internal stormwater drainage and water reticulation for a 43 acreages lots at Samford
     
    Portal Street Oxley
    Contract value                          - $1.4M
    Engineer                                     - Mike Andrews
    Time To Complete                   - 14 Weeks
    Project / Site Manager            - Richard Probert
    Description of works              - The works include Internal and external service work on existing streets and internal roadworks, stormwater and sewerage reticulation for 31 lots.
     
     
    Park Lake Estate Wellington Point
    Contract value                         - $1.1M combined
    Client                                          - Collin Park Pty Ltd
    Engineer                                    - Flanagan Consulting
    Time To Complete                   - 10 Weeks
    Project / Site Manager           - Ian Hargreaves
    Description of works             - The works include bulk earthworks (Importing 15,000m3) Internal service work roadworks, stormwater and sewerage reticulation and landscaping for 30 residential allotments.
     
    Centrus Estate Eight Mile Plains
    Contract value                          - 3 stages total $3M
    Client                                          - M2 Property Group
    Engineer                                    - Lambert and Rehbein
    Time To Complete                   - 14 Weeks per stage
    Council                                       - Brisbane City Council
    Project Manager                     - Richard Probert
    Description of works                                                         - The works include bulk earthworks the construction of internal roadworks, external and internal stormwater drainage, internal and external sewerage reticulation and water reticulation for a multistage townhouse development
     
    Manly Road Wakerley
    Contract value                          - $0.4M
    Client                                           - PRA Developments
    Engineer                                     - JF&P Consulting
    Time To Complete                    - 18 Weeks
    Council                                        - Brisbane City Council
    Project Manager                      - Richard probert
    Description of works              - The works include bulk earthworks the construction of internal roadworks, internal stormwater drainage, internal sewerage reticulation and water reticulation for a 24 small lot subdivisional lots at Wakerley on Brisbanes East
     
    30 & 49 retreat Street Bridgeman Downs
    Contract value                          - $1M combined
    Client                                           - Oxmar Properties, Richard Barber
    Engineer                                     - Qantec McWilliam
    Time To Complete                   - 12 Weeks
    Project / Site Manager           - Ian Hargreaves
    Description of works              - The works include Internal and external service work on existing streets and cul de sac works to be constructed from structural concrete and porphyry rock.

    Creekwod Estate stage 4 Caloundra
    Contract value                         - $1.2M
    Client                                          - AV Jennings
    Engineer                                    - Bornhorst and Ward Consulting
    Time To Complete                   - 14 Weeks
    Council                                       - Caloundra City Council
    Project Manager                     - Mark Hunter
    Description of works             - The works includes bulk earthworks (import 20,000m3 fill), the construction of internal roadworks, internal and external stormwater drainage, internal sewerage reticulation and water reticulation for 25 subdivisional lots at Little Mountain Sunshine Coast. This is the fourth stage of 6 stages of work on this site.
     
    109 Cowie Road
    Contract value                          - $0.4M
    Client                                          - Jukes Developments
    Engineer                                    - Bayside Consulting
    Time To Complete                   - 10 Weeks
    Council                                       - Brisbane City Council
    Project Manager                      - Ian Hargreaves
    Description of works              - The works include bulk earthworks the construction of internal roadworks, internal and external stormwater drainage, internal sewerage reticulation and water reticulation for a 7 small lot subdivisional lots at Carseldine
     
    King Avenue Durack
    Contract value                          - $0.8M
    Client                                          - Dumbarton Hotels
    Engineer                                    - Brown Consulting
    Time To Complete                   - 12 Weeks
    Council                                       - Brisbane City Council
    Project Manager                      - Richard Probert
    Description of works              - The works include bulk earthworks the construction of internal roadworks, internal stormwater drainage, swerage reticulation and water reticulation for a 20 lots at Durack
     
    Ann and Marsden Street Kallangur Stage
    Contract value                          - $2.1M
    Client                                          - Oxmar Properties
    Engineer                                    - Swaan Consulting
    Time To Complete                   - 18 Weeks
    Council                                       - Pine Rivers Shire Council
    Project Manager                      - Ian Hargreaves
    Description of works              - The works includes bulk earthworks (over 47000m3 of cut to fill), the construction of internal roadworks, internal and external stormwater drainage, internal sewerage reticulation and water reticulation for 34 subdivisional lots at Kallangur. This is the first of 4 stages of work on this site. Construction of 1000m2 of retaining walls was also included in this project

  • Lot 5 Westwood Drive Samford


    Contract value - $2M

    Client - Haig Developments

    Engineer - Brown Consulting

    Time To Complete - 16 Weeks

    Council - Pine Rivers Shire Council

    Project Manager - Ian Hargreaves

    Client contact - Ian Webb (07) 32315555

    Description of works - The works include bulk earthworks the construction of internal roadworks (2km), internal stormwater drainage and water reticulation for a 43 acreages lots at Samford

  • Wetlands construction Redbank


    Contract value - $1.0M

    Client - Queensland Rail

    Engineer - Queensland Rail

    Time To Complete - 20 Weeks

    Project Manager - Ian Hargreaves

    Client contact - Alistair Douglas (07) 3235 2718

    Description of works - The works includes bulk earthworks 15,000m3, clay lining, the construction of internal roadworks, stormwater drainage, Gross pollutant and Hydrocarbon monitoring equipment and planting of artificial wetlands at the Queensland Rail Workshops at Redbank.